Apparatus and method for lateral well drilling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9567809
APP PUB NO 20120067647A1
SERIAL NO

13226489

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A downhole tool assembly for cutting laterally into an earthen formation from a wellbore. The downhole tool assembly includes a cutting head assembly and a flexible tubular member, wherein the cutting head assembly includes a rotatable nozzle and a cutting head sized and configured to cut laterally into the earthen formation. The downhole tool assembly may be guided through a channel defined by a guide assembly and positioned such that the cutting head is proximate the portion of the earthen formation to be laterally cut. A rotational source may be operatively connected and in fluid communication with the conduit and flexible tubular member, whereby torque generated by the rotational source is translated by the flexible tubular member to the cutting head, causing the cutting head to rotate and cut the earthen formation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Savage, James M Ragley, US 15 107

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00