Sand control assemblies including flow rate regulators

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9567833
APP PUB NO 20160153263A1
SERIAL NO

14377506

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sand control completion system comprises: (A) a first flow rate regulator, wherein the first flow rate regulator is positioned in a first interval of a wellbore, wherein the first flow rate regulator is part of a first sand control assembly; and (B) a second flow rate regulator, wherein the second flow rate regulator is positioned in a second interval of the wellbore, wherein the second flow rate regulator is part of a second sand control assembly, wherein a reservoir fluid is caused or allowed to simultaneously flow through the first and second flow rate regulators into a tubing string, wherein the reservoir fluid is commingled into a single fluid stream within the tubing string. A method of using the sand control completion system to simultaneously produce a reservoir fluid from more than one zone of a subterranean formation is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HALLIBURTON ENERGY SERVICES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gano, John C Carrollton, US 120 4949
Garrison, Gregory W Carrollton, US 1 2
Jannise, Richard C Houston, US 2 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00