Salicide formation on replacement metal gate finFet devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9577096
SERIAL NO

14715730

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fin field effect transistor (finFET) device and a method of fabricating a finFET are described. The method includes forming a replacement gate stack on a substrate between inside walls of sidewall spacers, epitaxially growing a raised source drain (RSD) on the substrate adjacent to outside walls of the sidewall spacers, and forming a silicide above the RSD and along the outside walls of the sidewall spacers. The method also includes depositing and polishing a contact metal above portions of the replacement gate stack and the RSD, the contact metal contacting the silicide along the outside walls of the sidewall spacers adjacent to the portions of the replacement gate stack.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Leobandung, Effendi Stormville, US 536 4748
Seo, Soon-Cheon Glenmont, US 194 1179
Yamashita, Tenko Schenectady, US 599 4947
Yeh, Chun-Chen Clifton Park, US 417 3455

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 21, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00