Transfer switch for automatically switching between alternative energy source and utility grid

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9583942
APP PUB NO 20120267957A1
SERIAL NO

13350964

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An automatic transfer switch configured for connection to a non-traditional, full-time or intermittent power source, such as a wind turbine or solar panel, selectively connects the non-traditional power source as a primary power source and a utility-derived power source as a secondary power source. The intermittent power source includes an energy storage device, such as a bank of DC batteries, to supplement power delivery during periods of low energy production. The power is provided to an AC load via a DC-to-AC inverter. The transfer switch includes an input to monitor the voltage level on the energy storage device and will switch from the primary power source to the utility power source when the voltage level on the energy storage device drops below a preset level. Thus, a loading condition that exceeds the rating of the inverter will not fault the inverter or limit the power available to the loads.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RELIANCE CONTROLS CORPORATION2001 YOUNG COURT RACINE WI 53404

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Czarnecki, Neil A Mt. Pleasant, US 52 544

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00