Connecting a PVLAN switch to a non-PVLAN device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9584339
SERIAL NO

14609495

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A PVLAN switch for connecting a PVLAN to a non-PVLAN device is configured as a primary VLAN with secondary VLANs, the primary VLAN includes promiscuous ports, each of the secondary VLANs includes a smart PVLAN trunk port, and the smart PVLAN trunk port is included in at least two secondary VLANs where the smart PVLAN trunk port and the promiscuous port connect to non-PVLAN devices. A frame is received on a smart PVLAN trunk port sent from a non-PVLAN device, and includes a destination address and a secondary VLAN ID. The PVLAN switch port ID for the first frame, and a primary VLAN ID for the secondary VLAN ID are identified. If the frame is a non-isolated port, the secondary VLAN ID is modified to be the primary VLAN ID, and the modified frame is sent to another non-PVLAN device connected to the PVLAN switch port.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
He, Guo X Suzhou, CN 5 16
Tang, Gang Nanjing, CN 63 260
Zhu, Yi J Wuxi, CN 4 8
Zhu, Zheng D Wuxi, CN 7 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 28, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00