Determining the phase compositions of a multiphase fluid flow

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9588083
APP PUB NO 20140069168A1
SERIAL NO

14026215

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of determining the phase compositions of a multiphase fluid flow in a fluid line, including obtaining a vibration signal from the fluid flow using a vibration sensor comprising a target disposed in the fluid flow which vibrates in response to fluid flow in the fluid line. The vibration signal is analyzed to determine a first energy parameter which is related to the energy of the vibration signal within a first frequency band, and a second energy parameter which is related to the energy of the vibration signal within a second frequency band; and a phase composition parameter, such as a dryness parameter, relating to the phase compositions of the fluid flow is determined using the first and second energy parameters. An apparatus for determining the phase compositions of a multiphase fluid flow in a fluid line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SPIRAX-SARCO LIMITEDCHELTENHAM GLOUCESTERSHIRE GL53 8ER

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frisby, Ben Gloucestershire, GB 6 14
Islam, Nashtara Gloucestershire, GB 4 2
Kane, Mitchell Gloucestershire, GB 1 2
Usher, Peter Gloucestershire, GB 4 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00