Routing of enterprise resource planning messages

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9588503
SERIAL NO

13676998

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An Enterprise Resource Planning (ERP) gateway is provided for routing of ERP messages to Manufacturing Execution System (MES) applications. The gateway can receive a message from an ERP system via a manufacturing services bus specifying a business objective requiring action at a control level of an enterprise. The received message can be routed to a selected MES application capable of carrying out the business objective based on attributes within the message. Message routing can be based on location tags contained in the message. The message can also be routed to a selected subset of MES applications based on an analysis of respective capabilities and control contexts of the MES applications. Messages can be routed between the ERP system and the MES applications via the manufacturing services bus, which can manage protocol transformations for a heterogeneous set of applications.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROCKWELL AUTOMATION TECHNOLOGIES, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bobba, Suryanarayana Murthy Los Altos, US 6 140
Chambers, Keith Scott's Valley, US 14 132
Chao, Kevin Mountain View, US 15 290
Cooper, David Cedar Park, US 94 1446
Henning, Brandon E Palmyra, US 5 102
Moor, Crisler San Jose, US 5 102
Sze, Richard Saratoga, US 9 272

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 7, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00