Performance analysis of a database

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9589019
APP PUB NO 20130311446A1
SERIAL NO

13887718

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system are provided for performance analysis of a database. The method includes receiving a proposed data model, generating a hypothetical query workload using a plurality of sample query templates representing different query constructs for the proposed data model, generating hypothetical optimizer statistics using predefined generating rules that include a projected cardinality for the proposed data model and creating a sample empty database and database schema using the proposed data model. The method also includes applying the hypothetical optimizer statistics to the sample empty database, based on generating the hypothetical optimizer statistics, applying each query construct of the hypothetical query workload to the database schema and estimating a cost of the hypothetical query workload for the proposed data model.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clifford, Austin Dublin, IE 27 336
Emanowicz, Konrad Dublin, IE 20 315
McCallig, Enda Robertstown, IE 16 99

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 7, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00