Method for producing olefin block polymer using group 4 transition metal complex

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9593194
APP PUB NO 20140163173A1
SERIAL NO

14176537

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing an olefin block polymer, the method including: polymerizing olefins using a polymerization catalyst (X) and an organometallic compound (C) containing an atom of any of Groups 2, 12, and 13 of the periodic table of the elements, the organometallic compound (C) excluding an activating co-catalyst agent (B), wherein the polymerization catalyst (X) is formed by bringing a transition metal compound (A) into contact with the activating co-catalyst agent (B), the transition metal compound (A) is represented by the following general formula (1), and the activating co-catalyst agent (B) is selected from among an organoaluminumoxy compound (B-1), an organoboron compound (B-2), a zinc co-catalyst component (B-3), and ion-exchange layered silicate (B-4).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUMITOMO CHEMICAL COMPANY, LIMITED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishiwata, Koji Ichihara, JP 15 94
Takano, Masato Ichihara, JP 4 61
Takaoki, Kazuo Ichihara, JP 22 86

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 14, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00