Air preheating and NOx reduction integrated reactor and reaction method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9597633
SERIAL NO

14762313

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air preheating and denitration integrated reactor and reaction method. The reactor includes a rotary catalyst body, housing arranged outside the rotary catalyst body, and gas inlet and outlet channels on upper and lower surfaces of the housing; the gas inlet and outlet channel is in divided three, namely flue gas, reductant, and air inlet and outlet channels, the rotary catalyst body is cylindrical and includes a central shaft rotor and multiple circular catalyst layers rotate around the central shaft rotor, each circular catalyst layer is divided into air, flue gas and reductant zones by a radial sealing plate and axial sealing plate. In each circular catalyst layer, a catalyst in the reactor alternately circulates in flue gas, reductant and air zones. The catalyst performs heating-reheating-cooling process on catalyst layers along with the reactor rotation, different temperatures and reaction atmospheres in zones conductive of air preheating and denitration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHANDONG UNIVERSITY250100 NO 27 DA NAN ROAD LICHENG DISTRICT SHANDONG JI'NAN JINAN CITY SHANDONG PROVINCE 250100

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Xingxing Shangdong, CN 3 1
Ma, Chunyuan Shangdong, CN 11 1
Wang, Tao Shangdong, CN 1447 9693
Wang, Zhiqiang Shangdong, CN 138 780

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00