Electrochemical fabrication method including elastic joining of structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9597834
APP PUB NO 20140239541A1
SERIAL NO

14194214

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Forming multi-layer 3D structures involving the joining of at least two structural elements, at least one of which is formed as a multi-layer 3D structure, wherein the joining occurs via one of: (1) elastic deformation and elastic recovery, (2) relative deformation of an initial portion of at least one element relative to another portion of the at least one element until the at least two elements are in a desired retention position after which the deformation is reduced or eliminated, or (3) moving a retention region of one element into the retention region of the other element, without deformation of either element, along a path including a loading region of the other element and wherein during normal use the first and second elements are configured relative to one another so that the loading region of the second element is not accessible to the retention region of the first element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MICROFABRICA INC7911 HASKELL AVENUE VAN NUYS CA 91406

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arat, Vacit LaCanada Flintridge, US 82 1718
Cohen, Adam L Dallas, US 257 5746
Lockard, Michael S Lake Elizabeth, US 160 3821
Smalley, Dennis R Newhall, US 214 7959

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00