Light-weight, multi-layered composite substrate and method of making the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9597856
APP PUB NO 20150158270A1
SERIAL NO

14555999

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lightweight, multi-layered composite substrate for a vehicle interior material and a method for manufacturing the same are disclosed. A method for manufacturing a lightweight, multi-layered composite substrate including a core layer being a foam sheet and reinforcement layers stacked on both surfaces of the core layer includes preparing the foam sheet, forming each of the reinforcement layers by forming a low-density reinforcement sheet by mixing a natural fiber with a synthetic fiber by carding, subjecting the mixed natural fiber and synthetic fiber to cross wrapping and needle punching, coating polyolefin-based powder to a weight per unit area of 10 g/m2 to 100 g/m2 on the low-density reinforcement sheet, and pressing the low-density reinforcement sheet by a heat roller set to 150 to 230° C., and obtaining a multi-layered composite substrate by stacking the reinforcement layers on both surfaces of the foam sheet by heat.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HANIL E-HWA CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Ki-Sung Asan-si, KR 77 1444
Park, Sung-Ho Asan-si, KR 87 907

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 21, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00