Process for the preparation of a catalyst support

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9604204
SERIAL NO

13641710

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Process for preparing a catalyst support which process comprises a) mixing pentasil zeolite having a bulk silica to alumina molar ratio in the range of from 20 to 150 with water, a silica source and an alkali metal salt, b) extruding the mixture obtained in step (a), c) drying and calcining the extrudates obtained in step (b), d) subjecting the calcined extrudates obtained in step (c) to ion exchange to reduce the alkali metal content, and e) drying the extrudates obtained in step (d); process for preparing a catalyst by furthermore impregnating such support with platinum in an amount in the range of from 0.001 to 0.1 wt % and tin in an amount in the range of from 0.01 to 0.5 wt %, each on the basis of total catalyst; ethylbenzene dealkylation catalyst obtainable thereby and a process for dealkylation of ethylbenzene which process comprises contacting feedstock containing ethylbenzene with such catalyst.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHELL OIL COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Domokos, László Amsterdam, NL 24 165
Geerinck, Peter Wondelgem, BE 7 23
Klazinga, Aan Hendrik The Hague, NL 11 66

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 28, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00