Thermal management in a multi-phase power system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9606562
APP PUB NO 20160139619A1
SERIAL NO

14831976

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One aspect is a method that includes applying a plurality of incrementally varying voltage targets to a plurality of power phase converters operating in parallel between a source voltage rail and a load voltage rail. A phase temperature of each of the power phase converters is monitored. The phase temperature of each of the power phase converters is compared to a thermal adjustment limit. One or more of the power phase converters are adjusted to reduce an associated output current based on determining that at least one of the power phase converters exceeds the thermal adjustment limit. Power phase converter adjustments can be performed in a balanced manner such that a net sum voltage at the load voltage rail is substantially unchanged after the adjustments.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goth, Gary F Pleasant Valley, US 53 1521
Makowicki, Robert P Staatsbury, US 9 86
Shevach, Steven G Hurly, US 9 67
VanDeventer, Allan C Poughkeepsie, US 21 320
Wei, Xiaojin Poughkeepsie, US 37 659

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 28, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00