Rack positioning assembly for an electric panel, electric panel comprising one such assembly and method for fitting this assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9608414
APP PUB NO 20150295390A1
SERIAL NO

14670882

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The inventive rack positioning assembly for an electric panel comprises a vertical busbar (J2) for distributing electric current to electric appliances, said busbar comprising several bars, which are positioned in a same vertical plane and on which it is provided to connect racks of the electric panel, and several rack positioning modules (20), which are positioned above one another and which surround the bars of the vertical busbar. The positioning modules (20) comprise means (50) for increasing the insulation distance between the bars at the interface between two successive modules, that insulation distance corresponding to the length of the electric creep path between the bars.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SCHNEIDER ELECTRIC INDUSTRIES SAS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blochouse, Philippe La Motte Servolex, FR 2 12
Carle, Pierre Saint Pierre d'Albigny, FR 5 99
Pellicano, Joseph St Alban Leysse, FR 4 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 28, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00