Methods, apparatuses, related computer program product and data structure for deciding on a signaling scheme for handover

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9609554
SERIAL NO

14753448

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first method (and related first apparatus) includes transmitting, in a handover request message, an indication of a first protocol version; a second method (and related second apparatus) includes receiving, in the handover request message, the indication, deciding, based on the received indication and a second protocol version, on a value of an information element included in a handover request acknowledgement message to be transmitted, the information element indicating usage of a first or second signaling scheme, and transmitting the handover request acknowledgement message including the information element; and in the first method receiving the handover request acknowledgement message including the information element; and a third method (and related third apparatus) including receiving the handover command message including the information element, and configuring according to one of the first and second signaling schemes indicated by the information element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WIRELESS FUTURE TECHNOLOGIES INCOTTAWA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bufe, Andreas Neuried, DE 11 80
Hwang, Woonhee Espoo, FI 100 1912
Schopp, Michael Ulm, DE 17 203

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00