Bone treatment systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9610110
SERIAL NO

14683506

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates in certain embodiments to medical devices for treating vertebral compression fractures. More particularly, embodiments of the invention relate to instruments and methods for controllably restoring vertebral body height by controlling the flow of bone cement into the interior of a vertebra and the application of forces causes by the cement flow. An exemplary system utilizes Rf energy in combination a conductive bone cement for selectively polymerizing the inflow plume to increase the viscosity of the cement. In one aspect of the invention, the system utilizes a controller to control bone cement flow parameters to either allow or disallow cement interdigitation into cancellous bone. A method of the invention includes pulsing the flows of bone cement wherein high acceleration of the flow pulses can apply expansion forces across the surface of the cement plume to reduce a vertebral fracture.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DFINE, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shadduck, John H Menlo Park, US 373 60174
Truckai, Csaba Saratoga, US 349 59390

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 4, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00