Composite porous polymeric membrane with high void volume

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9610548
APP PUB NO 20150246328A1
SERIAL NO

14193916

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Composite membranes comprising a layer having first and second microporous surfaces and a bulk between the surfaces, the bulk comprising a first set of pores having outer rims, and a second set of pores connecting the rims, and a polymer matrix supporting the first set of pores; and, a second layer having first and second porous surfaces and a second bulk between the porous surfaces, wherein the second bulk comprises a fibrous matrix; or, first and second microporous surfaces and a second bulk between the microporous surfaces, the second bulk comprising: a third set of pores having outer rims and a fourth set of pores connecting the rims, and a polymer matrix supporting the third set of pores; a third set of pores prepared by phase inversion; or, a fibrous matrix; or, a third set of pores prepared by stretching, track etching or e-beam, are disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CYTIVA US LLC100 RESULTS WAY MARLBOROUGH MA 01752

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
David, Yolando Glen Cove, US 9 67
Harton, Shane Edward Port Washington, US 9 67
Singh, Amarnauth Selden, US 20 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 4, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00