High-temperature energy store with recuperator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9611761
SERIAL NO

14358150

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A charging circuit for converting electrical energy into thermal energy is provided, having a compression stage, connected via a shaft to an electric motor, a heat exchanger and an expansion stage, which is connected via a shaft to a generator, wherein the compression stage is connected to the expansion stage via a hot-gas line, and the heat exchanger is connected on the primary side into the hot-gas line, wherein the expansion stage is connected via a return line to the compression stage, so that a closed circuit for a working gas is formed. A recuperator is also provided which, on the primary side, is connected into the hot-gas line between the heat exchanger and the expansion stage and, on the secondary side, is connected into the return line, so that heat from the working gas in the hot-gas line can be transferred to the working gas in the return line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS AKTIENGESELLSCHAFTWERNER-VON-SIEMENS-STRASSE 1 MÜNCHEN 80333

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brunhuber, Christian Auerbach, DE 26 63
Graeber, Carsten Erlangen, DE 27 53
Zimmermann, Gerhard Hochstadt/Aisch, DE 42 323

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00