Dynamic adjustment of audio production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9612792
SERIAL NO

14739954

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatuses, methods, and computer-readable media for dynamic configuration of audio production are described. Audio production nodes (“APNs”) may produce audio. The APNs and may be configured to be compliant with a Precision Time Protocol (“PTP”). The APNs may be configured to perform dynamic configuration of audio production. An APN may receive configuration-related information transmitted from one or more other APNs, such as in association with operation of the PTP. An APN, in response to receipt of this configuration-related data, may modify configuration settings used for its audio production such as modification of timing, tone, power, intensity, equalization settings, or other configuration settings. The APN may be configured to produce its own configuration-related data for use by other APNs to modify the other APNs' configuration settings. Other embodiments may be described and/or claimed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEL CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pawar, Sagar C Bangalore, IN 23 65
Pillai, Prakash Bangalore, IN 14 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 4, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00