Hybrid circuit including a tunnel field-effect transistor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9613955
SERIAL NO

14965019

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates generally to integrated circuits and more particularly, to a structure and method of forming a hybrid circuit including a tunnel field-effect transistor (TFET) and a conventional field effect transistor (FET). Embodiments of the present invention include a hybrid amplifier which features a TFET common-source feeding a common-gate conventional FET (e.g. a MOSFET). A TFET gate may be electrically isolated from an output from a conventional FET. Thus, a high impedance input may be received by a TFET with a high-isolation output (i.e. low capacitance) at a conventional FET. A hybrid circuit amplifier including a TFET and a conventional FET may have a very high input impedance and a low miller capacitance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Brent A Jericho, US 537 6653
Ethirajan, Tamilmani Bangalore, IN 13 40
Nowak, Edward J Essex Junction, US 635 14983

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 4, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00