Cokeless reverberatory furnace for melting iron with separate hearth and melting chamber

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9617610
SERIAL NO

14336435

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process of melting ferrous metal using a gaseous fuel, a liquid fuel or a pulverized solid fuel in a cokeless horizontal reverberatory furnace (FIG. 1) consisting of a hearth (1), an sloped melting chamber (2) a vertical refractory grid (4), a burner (3), a recuperator or regenerator (5) to transfer heat from waste gas and products of combustion to fresh oxygen bearing gases, whereas a burner system is installed on the hearth for combustion of the fuel and oxygen bearing gas, the hearth under the burner acts as a superheater to achieve the temperature necessary for alloying and to receive the molten metal cascading from the sloped melting chamber, the sloped melting chamber being fed from one end by the rising gas products of combustion and in which the waste gases are subject to post-combustion of carbon monoxide and volatiles before passing through a recuperator or a regenerator to pre-heat the oxygen bearing gases necessary for combustion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABULNAGA BAHA ELSAYEDBELLINGHAM WA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abulnaga, Baha Elsayed Bellingham, US 6 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00