Hydrogen gas generating member and hydrogen gas producing method therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9617622
APP PUB NO 20120107228A1
SERIAL NO

12674323

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydrogen gas generating member includes a metal alloy having dispersed aluminum. The metal alloy includes an Al—X alloy, where X is Sn: 10.1 to 99.5% by mass, Bi: 30.1 to 99.5% by mass, In: 10.1 to 99.5% by mass, Sn +Bi: 20.1 to 99.5% by mass, Sn +In: to 10 to 99.5% by mass, Bi+In: 20.1 to 99.5% by mass, or Sn+Bi+In: 20 to 99.5% by mass. Hydrogen gas is generated by bringing the hydrogen gas generating member into contact with water.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JAPAN SCIENCE AND TECHNOLOGY AGENCYKAWAGUCHI-SHI SAITAMA 332-0012

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hagisawa, Takehito Sendai, JP 1 19
Ishida, Kiyohito Sendai, JP 51 390
Kainuma, Ryosuke Natori, JP 33 278
Ohnuma, Ikuo Shibata-gun, JP 10 131
Omori, Toshihiro Sendai, JP 32 146
Takaku, Yoshikazu Sendai, JP 5 62

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00