Hydraulic system for construction equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9618018
APP PUB NO 20160102686A1
SERIAL NO

14777658

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a hydraulic system for construction equipment, and more particularly, to a hydraulic system, in which an actuator is controlled by a pump/motor. The hydraulic system for construction equipment according to the present disclosure includes logic valves in first and second hydraulic lines provided to an actuator, respectively, and when it is desired to operate the actuator in a state where an operation of the actuator is stopped by closing the logic valves, a pressure difference may be resolved by increasing pressure in sections of a pump/motor and the logic valves in advance even if a load is applied to the actuator, and thus the actuator may implement a desired operation without being affected by the load. That is, it is possible to improve operation controllability of the actuator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HD HYUNDAI INFRACORE CO LTD489 INJUNG-RO DONG-GU INCHEON 22502

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
An, Min Ha Seoul, KR 3 18
Cho, Yong Lak Incheon, KR 8 23
Jang, Dal Sik Seoul, KR 9 25
Jung, Woo Yong Seoul, KR 16 46
Lim, Kwang Ho Seoul, KR 4 18
Seo, A Reum Incheon, KR 2 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00