Bus bar, bus bar module, and method of manufacturing bus bar

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9620263
APP PUB NO 20150255192A1
SERIAL NO

14436315

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bus bar (1) comprises: a laminated conductive wire (20) formed by arranging side by side in the longitudinal direction a first plate-shaped conductive wire (21) formed by spirally winding stripe conductors (11, 12) mutually adjacent in the width direction while bringing the opposing inner surfaces closer to each other, and a second plate-shaped conductive wire (22) formed by spirally winding the stripe conductors (11, 12) in the direction opposite the direction of the first conductive wire (21) while bringing the opposing inner surfaces closer to each other, and overlapping these wires (21, 22) so that the outer surfaces in the width direction face each other; and terminals (30) joined to the first conductive wire (21) and the second conductive wire (22) at both ends of the laminated conductive wire (20).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL, LTD.);KOBE STEEL, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Hideo Kobe, JP 48 537
Ichihara, Chikara Kobe, JP 2 32
Inoue, Kenichi Kobe, JP 146 1377
Ogawa, Tetsuya Kobe, JP 146 1185

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 11, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00