Smart Ethernet edge networking system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9621375
SERIAL NO

11519503

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system is provided for controlling the flow of data-packet traffic through an Ethernet telecommunications network having a multiplicity of nodes interconnected by multiple network links. Incoming data-packet traffic from multiple customer connections are received at a first node for entry into the network via the first node. Flow control messages are generated to represent the states of the first node and, optionally, one or more network nodes upstream from the first node, and these states are used as factors in controlling the rate at which the incoming packets are admitted to the network. Alternatively, the flow control messages may be used to control the rate at which packets generated by a client application are transmitted to the first node.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CIENA CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barrett, Chris Nepean, CA 15 161
Frank, Pablo Ottawa, CA 6 151
Giroux, Natalie Ottawa, CA 18 545
Smith, Brian Ottawa, CA 250 6439
Young, Ken Kanata, CA 26 941

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 11, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00