Ultrasonic instrument assembly and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9622766
APP PUB NO 20150057692A1
SERIAL NO

13973711

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ultrasonic surgical instrument assembly has a base, a rigid probe shaft coupled at a proximal end to the base, a probe head at a distal end of the shaft, and a sheath having a rigid distal end portion surrounding the shaft. The shaft has a longitudinal axis and is operatively connectable to a source of ultrasonic vibrational energy. The head extends eccentrically in a transverse direction to one side of the shaft, the head having an operative tip or surface spaced laterally from the axis. The distal end portion of the sheath is provided in a side wall with an aperture, and the probe head is aligned with the aperture. The sheath is coupled at a proximal end to the base and is provided with a partially flexible section between the distal end portion of the sheath and the instrument assembly base, so that the distal end portion is pivotably deflectable transversely to the axis in response to a lateral force applied to the distal end portion, to enable an increased protrusion of the head through the aperture.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MISONIX OPCO LLC1938 NEW HIGHWAY FARMINGDALE NY 11735

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Voic, Dan Cedar Grove, US 77 4839

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00