Method for producing a surface structure with lightning protection, and surface structure which can be produced in this way

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9623984
SERIAL NO

14122426

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a surface structure with a lightning strike protective system involves providing a support structure based on a fiber-reinforced composite material. At least one arrangement of a lightning strike protective material made from or with a conductive material is applied onto the support structure so that the lightning strike protective material arrangement adheres to the support structure in such a way that it is held securely in its position. A cover material is applied in such a way that it embeds the at least one arrangement of a lightning strike protective material that is held securely in its position on the support structure, and the cover material is solidified.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EADS DEUTSCHLAND GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Englhart, Martin Schoenau, DE 3 33
Jonke, Dietrich P Haar, DE 2 31
Piringer, Helmut Baldham, DE 11 60
Steinwandel, Juergen Uhldingen, DE 50 392
Wulbrand, Wilhelm Markdorf, DE 4 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 18, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00