Method for the assembly of frustoconical concrete towers and concrete tower assembled using said method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9624687
SERIAL NO

14576631

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for the assembly of frustoconical concrete towers comprising a step of placing and positioning of at least one subset of a tower section formed by at least two segments in an area close to the base of the tower, a step of assembling the subset of the tower section by attaching at least two segments, so that the assembled subset is freestanding and a step of stacking the assembled subset onto an immediately lower tower section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ACCIONA WINDPOWER, S.A.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aranzadi, De Miguel Paula Navarra, ES 2 10
Aristegui, Lantero Jose Luis Navarra, ES 18 47
Arlaban, Gabeiras Teresa Navarra, ES 43 168
Etxandi, Irungarai Inaki Navarra, ES 2 10
Garcia, Maestre Ivan Navarra, ES 11 35
Garcia, Sayes Jose Miguel Navarra, ES 39 112
Gaston, Lujambio Ander Navarro, ES 6 36
Martin, Diaz Javier Navarra, ES 1 5
Nunez, Polo Miguel Navarra, ES 40 108
Soroa, Sisamon Enrique Navarra, ES 2 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 18, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00