Power saving mode hybrid drive access management

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9626126
APP PUB NO 20140325166A1
SERIAL NO

13869622

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid drive includes multiple parts: a performance part (e.g., a flash memory device) and a base part (e.g., a magnetic or other rotational disk drive). A drive access system, which is typically part of an operating system of a computing device, issues input/output (I/O) commands to the hybrid drive to store data to and retrieve data from the hybrid drive. The drive access system supports multiple priority levels and obtains priority levels for groups of data identified by logical block addresses (LBAs). The LBAs read while the device is operating in a power saving mode are assigned a priority level that is at least the lowest of the multiple priority levels supported by the device, increasing the likelihood that LBAs read while the device is operating in the power saving mode are stored in the performance part of the hybrid drive.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MICROSOFT TECHNOLOGY LICENSING, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alexander, Robin A Woodinville, US 21 267
Bak, Yevgeniy M Redmond, US 36 413
Bluestein, Eric M Seattle, US 7 50
Herron, Andrew M Redmond, US 11 306
Iyigun, Mehmet Kirkland, US 113 2873
Xing, Xiaozhong Sammamish, US 11 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 18, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00