Electrolytic capacitor for use in a charge/discharge circuit with shorter period and greater voltage difference

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9627145
APP PUB NO 20130301189A1
SERIAL NO

13947387

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrolytic capacitor according to the present invention employs a capacitor element wherein an anode foil having an anode internal terminal and a cathode foil having a cathode internal terminal are wound or laminated through a separator. The end of the anode foil faces with the cathode foil through the separator and the surface area of the cathode internal terminal is provided with an enlargement treatment, whereby the small area portion of the cathode foil that faces with the anode foil is eliminated, and the charge/discharge characteristics are thus improved. Furthermore, in the electrolytic capacitor provided with the capacitor element wherein the anode foil having the anode internal terminal and the cathode foil having the cathode internal terminal are wound or laminated through the separator, the capacitor element being impregnated with an electrolyte, the cathode internal terminal is composed of an aluminum material, the surface of the cathode internal terminal is etched and the concentration of iron in the etching layer is less than 300 ppm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON CHEMI-CON CORPORATIONTOKYO 141-8605

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Endoh, Fusayoshi Tokyo, JP 3 10
Nakaaki, Kentaro Tokyo, JP 3 20
Nakamura, Osamu Tokyo, JP 486 6724
Ozawa, Masashi Tokyo, JP 32 153
Yoshida, Koichi Tokyo, JP 91 914

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00