Insulation insert with an integrated shielding element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9627819
APP PUB NO 20150295365A1
SERIAL NO

14648041

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to an insulation insert that can be inserted into a plug-in connector housing (11) of a plug-in connector (10), wherein in the insulation insert (1), at least one contacting element for electrically contacting a conductor core of a cable (12) to be connected may be provided, wherein the insulation insert (1) is provided in one area with a conductive coating, wherein the coated area forms a shielding element (3) that can be electrically contacted with a shielding braid of the cable (12) to be connected and at the same time with the plug-in connector housing (11), and wherein the insulation insert (1) and the shielding element (3) are integrally formed in.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HARTING ELECTRONICS GMBH & CO. KG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beuth, Volker Stemwede, DE 1 8
Genau, Melanie Luebbecke, DE 8 48
Kraemer, Klaus Osnabrueck, DE 13 41
Post, Dirk Peter Luebbecke, DE 4 14
Schreier, Stephan Rahden, DE 19 449

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 18, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00