Biomass fractionation processes employing sulfur dioxide

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9631316
APP PUB NO 20140186899A1
SERIAL NO

14142923

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a process for fractionating lignocellulosic biomass, comprising: contacting biomass with SO2, water, and optionally a first solvent, to produce intermediate solids; then contacting the intermediate solids with SO2, water, and a second solvent, to produce cellulose-rich solids and a liquid phase comprising hemicelluloses and lignin. The first concentration of SO2 may be lower or higher than the second concentration of SO2. It is desirable to vary the SO2 and solvent concentrations in different stages to optimize the removal of hemicellulose versus lignin. The resulting cellulose-rich material can contain very low hemicellulose, very low lignin, or both low hemicellulose and low lignin. High-purity cellulose is useful both for producing glucose as well as for cellulose products or derivatives. The hemicelluloses may be hydrolyzed to produce monomeric sugars, and the lignin may be recovered as a co-product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • API INTELLECTUAL PROPERTY HOLDINGS, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pylkkanen, Vesa Atlanta, US 108 610
Retsina, Theodora Atlanta, US 148 777

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 25, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00