Method and apparatus for testing utility power devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9632128
APP PUB NO 20170016949A1
SERIAL NO

15279032

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for performing measurements on a utility power device that shares a common ground with the apparatus selectively sends a first high voltage signal via a first lead to a first terminal of the utility power device, measures a first corresponding signal returned via a second lead of the apparatus from a second terminal of the utility power device. While the corresponding first lead and the second lead of the apparatus remain electrically coupled to the corresponding first and the second terminal of the utility power device. The apparatus selectively sends a second high voltage signal via the second lead to the second terminal of the utility power device, and measures a second corresponding signal returned via the first lead of the apparatus from the first terminal of the utility power device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DOBLE ENGINEERING COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kennedy, George Matthew Roseville, US 3 5
Woodward,, Jr Robert Clark Cambridge, US 4 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 25, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00