Device for drawing tubular workpiece

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9636727
SERIAL NO

13059681

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device 10 for drawing a tubular workpiece is provided with a drawing die 20 and a drawing plug 30. The drawing die 20 includes a first curved surface section 1C from which the workpiece 40 is detached while being reduced in diameter, a die bearing section 2B arranged radially inward of and downstream of a workpiece separation point K of the first curved surface section 1C, and a guide section 2D having a second curved surface section 2C which smoothly continues to an upstream end of the die bearing section 2B and configured to again come into contact with the workpiece 40 detached from the first curved bearing section 1C to guide the workpiece to the die bearing section 2B while reducing a diameter of the workpiece 40. The drawing plug 30 has a plug bearing section 3B shorter than a length L4 of the die bearing section 2B. The plug bearing section 3B is arranged at a position corresponding to the die bearing section 2B.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RESONAC CORPORATIONTOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoya, Shigeru Oyama, JP 3 6
Hisayuki, Koji Oyama, JP 6 15
Oide, Masaaki Oyama, JP 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00