Process for the manufacturing of surface elements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9636922
APP PUB NO 20160303866A1
SERIAL NO

15195776

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Processes for manufacturing surface elements are provided. The surface elements can include a decorative upper layer and a supporting core. Processes for manufacturing such surface elements can comprise manufacturing a supporting core having a format essentially equaling the desired end user format and provided with an upper side and a lower side, providing a ground coating on the supporting core, and applying a digitally printed décor comprising inks of at least four colors directly on top of the ground coating by means of an ink-jet type printer, said four colors comprising one or more colors different from cyan, magenta, yellow and black; said digitally printed décor being one of wood or mineral, and providing and curing an at least partly translucent wear layer on the upper side of the supporting core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNILIN NORDIC ABHYLLIE BOULEVARD 10A MALMÖ 215 32

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hansson, Krister Vellinge, SE 28 1221
Lundgren, Johan Malmo, SE 21 828
Wernersson, Hakan Höllviken, SE 21 1259

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00