Torque distribution method for engine and motor of energy-efficient hybrid electric vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9637110
SERIAL NO

14649513

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A torque distribution method for an engine and a motor of an energy-efficient hybrid electric vehicle comprises the following steps: providing an offline specific fuel consumption map of the engine in all operating states; enabling the engine and motor to respond to the required torque T during travelling together, the motor and the engine working in cooperation at the same rotational speed so as to achieve the optimal working efficiency; acquiring a current state of charge (SOC) of the vehicle battery, and distributing the engine torque T and the motor torque T according to the following situation: if the SOC is greater than a first preset value, entering a first distribution mode; if the SOC is less than a second preset value, enter a second distribution mode; and otherwise, maintaining the current working state. The method can fully utilize the performance advantage of the engine and that of the motor, so that the system works at high efficiency all the time, thereby decreasing the energy consumption of the vehicle, greatly reducing harmful emission, and facilitating energy conservation and environmental protection.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAIC MOTOR CORPORATION LTD200438 NO 2500 MILITARY ROAD SHANGHAI YANGPU DISTRICT MUNICIPAL DISTRICT SHANGHAI CITY 200438

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deng, Xiaoguang Shanghai, CN 2 17
Zhang, Feifei Shanghai, CN 35 103
Zhao, Yi Shanghai, CN 234 2740
Zhou, Yuxing Shanghai, CN 5 28
Zhu, Jun Shanghai, CN 689 4956

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00