System and method for the integrated production of first and second generation ethanol and the use of integration points for such production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9637762
APP PUB NO 20150064762A1
SERIAL NO

14389090

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and a process for the production of ethanol and related products from lignocellulosic biomasses (second generation—2G-ethanol), particularly from sugarcane bagasse and straw is provided, however not limited thereto, integrated with conventional processes for the production of ethanol (first generation—1G-ethanol) such as, for example, from sugarcane juice and/or molasses (either in sugar and ethanol plants or in autonomous distilleries), corn, grain, wheat, sugary sorghum, white beetroot, among others, including the recovery/reuse of streams and effluents. More specifically, an integrated process for the production of ethanol and related products where the process warrants increased efficiency particularly in the use of the raw material, steam, electric power and treated water is provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CTC - CENTRO DE TECNOLOGIA CANAVIEIRA S AFAZENDA SANTO ANTONIO S/N° CAIXA POSTAL 162 SANTO ANTONIO PIRACICABA - SP 13400-970

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andrade, Liliane Pires Piracicaba, BR 3 13
Araújo, Galvão Célia Maria Americana, BR 1 1
De, Lima Danilo Ribeiro Piracicaba, BR 2 1
Medeiros, Pinto José Ricardo Piracicaba, BR 1 1
Neto, Oswaldo Godoy Piracicaba, BR 3 2
Teodoro, Juliana Conceição Piracicaba, BR 1 1
Travassos, Rios Tomé José Augusto Piracicaba, BR 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00