Band-shaped superconducting element with improved self-protection in case of quenching

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9640979
APP PUB NO 20150031548A1
SERIAL NO

14327581

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A superconducting element (1) has a metallic substrate (2), an insulating layer (3), a superconductor layer (5) and a metallic protective layer (6), wherein the insulating layer (3) is arranged between the substrate (2) and the superconductor layer (5). In cross-section of the superconducting element (1), the insulating layer (3) extends at both ends past the area (BSL) of the substrate (2) covered by the superconductor layer (5) to galvanically separate the superconductor layer (5) and the metallic protective layer (6) from the substrate (2). The thickness D of the insulating layer (3) is selected in such a fashion that the superconducting element (1) has a transverse breakdown voltage between the metallic substrate (2) and both the superconductor layer (5) as well as the metallic protective layer (6) of at least 25 V. The superconducting element has a reduced risk of being damaged in case of a quench.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRUKER HTS GMBHEHRICHSTRASSE 10 D-63450 HANAU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Usoskin, Alexander Hanau, DE 34 125

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00