Electromagnetic platform motor (EPM) (EPM-1) (EPM-2)

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9641045
APP PUB NO 20160099630A1
SERIAL NO

14121645

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is a new 21st Century Electric Generation. It is an electromagnetic actuated generator mechanism that use magnetic field like a wrecking yard uses extremely powerful electromagnet device to move heavy piece of metal from one place to another. The electromagnetic actuated generator is supported by a platform with a track and wheel system, whereby the mechanism is control by the magnetic field of a wound coil of magnet wire, wherein current is supply by a DC variable power supply or a plurality of battery packs. The mechanism is connected to a plurality of levers with mechanical advantage connection to a ratchet system transforming reciprocating mechanical power to rotation mechanical power connected to a gear transmission system connected to an electrical generator for transforming the mechanical power to electrical energy.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LEWIS SR BILLNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lewis,, Sr Bill Oakland, US 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00