Sheet glass manufacturing method and manufacturing device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9643878
APP PUB NO 20150299019A1
SERIAL NO

14441934

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a manufacturing method for a glass sheet, including: fusing a glass ribbon (G) by irradiating the glass ribbon (G) with a laser (L) along a preset cutting line (X), which is a boundary between a product portion (G1) to be used as a product and a non-product portion (G2) to be discarded, and jetting an assist gas (A) onto molten glass (M) generated by melting the glass ribbon (G) through heating with the laser (L) so as to remove the molten glass (M) by scattering the molten glass (M); and breaking the non-product portion (G2) so as to discard the non-product portion (G2), the assist gas (A) being jetted from the product portion (G1) side with respect to the preset cutting line (X), to thereby cause scattered pieces of the molten glass (M) to adhere to the non-product portion (G2) as pieces of dross (D).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NIPPON ELECTRIC GLASS CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Takahide Shiga, JP 27 456
Inayama, Naotoshi Shiga, JP 16 237

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 9, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00