Methods for manufacturing a high-strength press-formed member

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9644247
APP PUB NO 20140096876A1
SERIAL NO

14100438

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a high strength press-formed member includes preparing a steel sheet having the composition including by mass %: C: 0.12% to 0.69%, Si: 3.0% or less, Mn: 0.5% to 3.0%, P: 0.1% or less, S: 0.07% or less, Al: 3.0% or less, N: 0.010% or less, Si+Al: at least 0.7%, and remainder as Fe and incidental impurities, heating the steel sheet to a temperature of 750° C. to 1000° C. and retaining the steel sheet in that state for 5 seconds to 1000 seconds; subjecting the steel sheet to hot press-forming at a temperature of 350° C. to 900° C.; cooling the steel sheet to a temperature of 50° C. to 350° C.; heating the steel sheet to a temperature in a temperature region of 350° C. to 490° C.; and retaining the steel sheet at temperature in the temperature region for 5 seconds to 1000 seconds.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JFE STEEL CORPORATIONTOKYO 100-0011

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Funakawa, Yoshimasa Tokyo, JP 114 740
Matsuda, Hiroshi Tokyo, JP 474 5592
Tanaka, Yasushi Tokyo, JP 116 932

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 9, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00