Identification of data committed to non-volatile memory by use of notification commands

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9645752
SERIAL NO

14322594

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for utilization of notification or ordering commands are disclosed that can enable more efficient processing of flush requests from software programs and increase data consistency in storage devices. A storage device can obtain a notification command from a host system identifying one or more data items in a cache of the storage device, determine whether the one or more data items have been committed to non-volatile memory of the storage device, and transmit a notification to the host system upon determining that the one or more data items have been committed. The host system may utilize these commands to process flush requests, such that upon receiving a flush request, a notification command may be issued requesting a notification from the storage device that the relevant data has been committed. Notification commands can target or limit the scope of a flush request, such that the speed and efficiency of the flush request processed using notification commands is increased relative to a non-specific full-cache flush. Such increases in efficiency of flush requests may greatly increase the speed and efficiency of storage devices, and consequently the performance of programs utilizing such storage devices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • WESTERN DIGITAL TECHNOLOGIES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Obr, Nathan Seattle, US 5 117

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 9, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00