Battery cell assembly and method for manufacturing a cooling fin for the battery cell assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9647292
APP PUB NO 20140308558A1
SERIAL NO

13861426

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery cell assembly having a cooling fin with a tube and a flexible thermally conductive sheet disposed on the tube is provided. The tube has first, second, and third tube portions. The sheet has first, second, and third sheet portions. The first and second sheet portions are disposed on at least the first and second tube portions, respectively, and the third sheet portion extends between the first and second tube portions. The assembly further includes a first clamping member clamping the first sheet portion to the first tube portion, and a second clamping member clamping the second sheet portion to the second tube portion. The assembly further includes a battery cell disposed against the third sheet portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ENERGY SOLUTION LTDTOWER 1 108 YEOUI-DAERO YEONGDEUNGPO-GU SEOUL 07335 REPUBLIC OF KOREA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Isayev, Igor Farmington Hills, US 12 438
Ketkar, Satish Troy, US 15 200
Merriman, Robert Shelby Township, US 37 374
Nielson, Michael Royal Oak, US 15 204

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 9, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00