Flexible printed circuit board and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9648753
APP PUB NO 20150359106A1
SERIAL NO

14758753

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for manufacturing a flexible printed circuit board and a flexible printed circuit board manufactured by using the same. A circuit pattern is formed with a conductive paste on one surface of a base material, and the circuit pattern is sintered at a temperature of 290° C. to 420° C. to manufacture the flexible printed circuit board. As such, manufacturing costs can be reduced and productivity can be improved through a simple yet convenient process. Also, the circuit pattern is formed without a plating process, such that the problem of circuit pattern separation occurring during the plating process can be addressed and product reliability can be improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMOGREENTECH CO LTDGIMPO-SI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Jong-Soo Yongin-si, KR 53 476
Kwon, O-Chung Cheongwon-gun, KR 4 40
Lee, Kyung-Hoon Paju-si, KR 99 1209
Yu, Jeong-Sang Gunpo-si, KR 5 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 9, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00