Catalyst for thermocatalytic conversion of biomass to liquid fuels and chemicals

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9649624
SERIAL NO

14705800

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Catalyst compositions comprising a phosphorous-promoted ZSM-5 component and a silica-containing binder, and methods for making and using same, are disclosed. More, specifically, processes for making a catalyst for biomass conversion are provided. The process includes: treating a ZSM-5 zeolite with a phosphorous-containing compound to form a phosphorous-promoted ZSM-5 component; preparing a slurry comprising the phosphorous-promoted ZSM-5 component and a silica-containing binder; and shaping the slurry into shaped bodes. Such catalysts can be used for the Thermocatalytic conversion of particulate biomass to liquid products such as bio-oil, resulting in higher bio-oil yields and lower coke than conventional catalysts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARD INC13001 BAY PARK ROAD PASADENA TX 77507

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adkins, Bruce League City, US 10 27
Bartek, Robert Centennial, US 47 842
Brady, Michael Studio City, US 54 1266
Hacskaylo, John Houston, US 2 4
Stamires, Dennis Newport Beach, US 116 1485

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 16, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00