Toolholder with insert clamp and method for changing cutting inserts on a toolholder

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9649694
APP PUB NO 20150231704A1
SERIAL NO

14434464

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A toolholder and method for use with a cutting insert having a clamping opening, comprising a toolholder body and a clamp pivotably mounted to and contacting the toolholder body and pivotable between a first position in which a protrusion of the clamp is disposed in a position in which it is arranged to be received in the clamping opening in the cutting insert to secure the cutting insert to the toolholder body and a second position in which the protrusion is spaced, relative to the toolholder, upwardly from the first position so that the cutting insert is not secured to the toolholder body by the protrusion. A resilient member is arranged relative to the clamp to urge the clamp to the first position and to resist pivoting of the clamp to the second position. An opening in the clamp may receive a portion of a separate lever.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SECO TOOLS AB;SECO TOLLS AB

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eriksson, Roger Fagersta, SE 3 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 16, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00