Thermal exchange food processing device and method of producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9651311
APP PUB NO 20140157605A1
SERIAL NO

14099116

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A thermal exchange food processing device includes a thermal conductive body, a thermal insulation layer and a phase change material. The thermal conductive body has an acting region and an inner thermal conductive region corresponding to, and in thermal connection with, the acting region. The thermal insulation layer has a lower thermal conductivity coefficient than the thermal conductive body and encapsulates, at least in part, the thermal conductive body, so that the acting region of the thermal conductive body is exposed while the remaining regions of the thermal conductive body other than the acting region are thermally insulated from ambient temperature. The thermal conductive body, alone or together with the thermal insulation layer, defines an accommodation space, and the inner thermal conductive region is situated to face the accommodation space. The phase change material is within the accommodation space.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THAT INVENTIONS CO7F-1 NO 237 SONGJIANG RD ZHONGSHAN DISTRICT TAIPEI CITY 104

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsieh, Jung-Ya Jhubei, TW 26 98
Lin, Yung-Fu Jhubei, TW 44 250

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00