System, method, and medium of optimizing load reallocation in an in-memory data management grid

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9652161
APP PUB NO 20160170668A1
SERIAL NO

14571518

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An in-memory data management (IMDM) system is described that includes an IMDM cluster, a load balancer, and a reallocation processor controller. The IMDM cluster includes a plurality of nodes. The controller determines whether there is an actionable load imbalance of existing data elements, stored among the plurality of nodes, based on a predefined criteria or rule. The controller further identifies a source node from which at least one data element is to be deleted and a target node to which the at least one data element that is to be deleted is to be added. The source node and target node contribute to the actionable load imbalance. The controller copies the at least one data element that is to be deleted from the source node into the target node, and deletes the at least one data element that is to be deleted from the source node.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SOFTWARE AG USA, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mehra, Gagan Oakland, US 4 68

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 16, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00