Multilayer ceramic component and board having the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9659710
SERIAL NO

14860309

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer ceramic component includes a multilayer ceramic capacitor including a ceramic body including a plurality of first and second internal electrodes, and first and second external electrodes, first and second insulation frames respectively including first and second horizontal insulation portions and first and second vertical insulation portions, first and second external conductive electrodes including first and second horizontal conductive portions and first and second vertical conductive portions, first and second internal conductive electrodes disposed on internal surfaces of the first and second vertical insulation portions and connected to the first and second external electrodes, and electrical connection portions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRO-MECHANICS CO LTDMAEYOUNG-RO 150 (MAETAN-DONG) YOUNGTONG-GU GYEONGGI-DO SUWON-SI 16674

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Park, Heung Kil Suwon-Si, KR 117 962
Park, Sang Soo Suwon-Si, KR 266 2623

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00